Kouter central police station Torhout

New-build project for a police station with 3400m² of commercial and office space

After decades of operating from various buildings spread across the entire police zone of Gistel, Ichtegem, Jabbeke, Oudenburg and Torhout, the police services are being centralised. Lokale Politie Kouter set up a participation process together with META, through which the design was shaped in mutual, open consultation. Throughout this process, police operations served as the primary benchmark against which the design had to meet.

The final design is a stepped building, both in height and depth, and perfectly symbolises the workings of the police.

  • On the ground floor, the ground-level functions are located for reasons of public accessibility (reception and interrogation rooms), vehicle access (vehicle airlock for the detainee zone), loading and unloading (logistics) and proximity (neighbourhood policing service).
  • On level +1, the offices of police staff are located, along with the canteen and the crisis room, where each emergency service (civil protection, fire brigade, ambulance, etc.) has its own quiet cell to enable rapid switching between multidisciplinary consultation and internal consultation within its own organisation in the event of a crisis.
  • On level +2, finally, the rooms of the corps leadership and supporting services are positioned.

The stepped form accommodates roof surfaces that are used as roof terraces or green roofs. Roof sections not visible from the surroundings are fitted with solar panels.

Every floor plan was designed in consultation with Lokale Politie Kouter, guided by a logical clustering of functions, the consistent application of security zoning and the limitation of long walking distances.
Thanks to the smart structural concept, load-bearing walls are avoided as much as possible, providing maximum floor plan flexibility for future operations: walls can be removed or added at any time.

The low-maintenance materials are, without exception, sustainable, solid and robust – a necessity in a police building.
The building also makes use of geothermal energy, coupled with concrete core activation, providing a sustainable thermal concept without compromising on comfort.

Collaborations

AIKO architecten en ingenieurs
structural engineering, MEP engineering
Studibo / Bureau De Fonseca
acoustical engineering
Ingenieursbureau France
infrastructure engineering
EVEKA
energy coordination